New construction

New Construction Plumbing Installation

Plumbing for new homes, additions and light commercial build-outs, from layout and rough-in to fixtures and final testing.

Technician down in an open trench on a sewer line excavation
From the job

01Residential, commercial & new build

New construction plumbing happens in stages. Underground work comes first: the building sewer and any drain lines under the slab. Rough-in follows once framing is up: water supply lines, drain, waste and vent piping, and gas lines run through the walls and floors before insulation and drywall. Finish comes last: fixtures, water heater and final connections.

Each stage gets tested and typically inspected before it is covered. Drain lines are tested for leaks, supply lines are pressure tested, and gas piping is pressure tested before any appliance is connected. Mistakes caught at rough-in cost a fraction of what they cost after the walls are closed.

We work with homeowners, builders and general contractors on single-family homes, additions, multi-unit properties and commercial build-outs, coordinating with the other trades so the schedule holds.

02When to call

Signs it's time

  • 01Building a new home or addition
  • 02Finishing a basement with a new bathroom or laundry
  • 03Commercial build-out or tenant fit-out
  • 04Multi-unit residential project
  • 05Major remodel that moves fixtures and drains

03How we handle it

  1. 1

    Plan the layout

    We review the plans, fixture locations and loads, and size the supply, drain, vent and gas piping.

  2. 2

    Underground and rough-in

    We install the building sewer and underslab drains, then rough in supply, drain, waste, vent and gas lines once framing is ready.

  3. 3

    Test before cover

    Each system is tested before walls close so problems are found while they are easy to fix.

  4. 4

    Finish and connect

    We set fixtures, install the water heater, make final connections and test the complete system.

04What's included

The scope, in plain terms

  • Plumbing layout and sizing
  • Building sewer and underground drain installation
  • Water supply line installation
  • Drain, waste and vent (DWV) installation
  • Rough-in for kitchens, baths and laundry
  • Gas line installation
  • Water heater and tankless installation
  • Fixture installation and final connections
  • Pressure testing at each stage

05Questions

What people ask about new construction plumbing

Do you work directly with homeowners or only with builders?

Both. We work with homeowners managing their own projects as well as builders and general contractors.

Can you add a bathroom in a basement below the sewer line?

Yes. When fixtures sit below the sewer, the waste is drained to a sealed basin and lifted by a sewage ejector pump. We plan and install that system along with the bathroom.

Who handles permits and inspections?

Plumbing on new construction requires permits and inspections. We plan our work around the inspection stages and coordinate with whoever holds the permit for the project.